ArcGIS REST Services Directory
Login
|
Get Token
Home
>
services
>
2015_Adopted_Planning_Scheme_PIP (MapServer)
>
Legend
Help
|
API Reference
JSON
Legend (2015_Adopted_Planning_Scheme_PIP)
Priority Infrastructure Area - PIA (1)
Infrastructure Service Area - ISA (2)
Fully Serviced
Partially Serviced (no wastewater)
Partially Serviced (no wastewater and no water supply)
Future Water Network (4)
Proposed Upgrade Water Treatment Plant
Proposed Upgrade, Highlift Pump Station
Proposed New, Pump Station
Proposed New, Booster Pump Station
Proposed New, Reservoir
Proposed Upgrade Inlet Structure
Future Water Mains (5)
Proposed New Water Main (Transfer)
Proposed New Water Main (Distribution)
Existing Water Network (6)
Water Treatment Plant
Weir
Highlift Pump Station
Pump Station
Booster Pump Station
Bore Pump Station
Flow Metering Station
Water Tower
Reservoir
Spraybed
Surge Tank
Dosing Station
Water Valve
Water Sampling Point
Monitoring Bore
Inlet Structure
Hydrant
Existing Water Mains (7)
Water Main (Transfer)
Water Main (Distribution)
Water Main (Reticulation)
Future Wastewater Network (9)
New Wastewater Treatment Plant
Upgrade Wastewater Treatment Plant
Decommission WWTP
Reuse Plant
Reuse Storage
New Pump Station
Upgrade Pump Station
Decommission Pump Station
Odour Control
Future Wastewater Mains (10)
Sewer Pressure Pipe
Sewer Gravity Trunk Pipe
Sewer Vacuum Trunk Pipe
Sewer Gravity Overflow Pipe SS
Existing Wastewater Network (11)
Wastewater Treatment Plant
Pump Station
Oxygen Injection Station
Dosing Station
Valve
Existing Wastewater Mains (12)
Sewer Gravity Trunk Pipe
Sewer Gravity Pipe
Sewer Vacuum Trunk Pipe
Sewer Gravity Overflow Pipe SS
Sewer Vacuum Pipe
Sewer Pressure Pipe
Sewer Pressure Siphon
Future Stormwater Mains (14)
Stormwater Pipe
Open Channel (Concrete/Stone)
Open Channel (Grass/Earth)
Future Stormwater Water Bodies (15)
Detention Basin
Existing Stormwater Network (16)
Pump Station
Gross Pollutant Trap
Aquifer Recharge Station
Existing Stormwater Mains (17)
Natural Channel (Creek/River)
Open Channel (Concrete/Stone)
Open Channel (Grass/Earth)
Stormwater Pipe
Box Culvert
Detention Storage
Absorption Trench
Existing Stormwater Water Bodies (18)
Detention Basin
Future BRC Road Structures (20)
Proposed New Bridge
Proposed New Signal Controlled Intersection
Proposed New Sign Controlled Intersection
Proposed Upgrade Sign Controlled Intersection
Proposed New Roundabout
Proposed Upgrade Roundabout
Proposed Upgrade, BRC Major Culvert
Future Roads (21)
Proposed New Highway (State-controlled Road)
Proposed New Sub Arterial
Proposed Upgrade Sub Arterial
Proposed New Trunk Collector
Proposed Upgrade Trunk Collector
Proposed New Industrial Collector
Proposed Upgrade Industrial Collector
Proposed Upgrade Principal Rural Road
Proposed Upgrade Rural/Rural Residential Collector
Future Pathway Structures (22)
Pathway Bridge
Future Pathways (23)
Principal Pathway
Distributor Pathway
Collector Pathway
Existing BRC Road Structures (24)
Bridge
Major Culvert
Causeway
Roundabout
Signal Controlled Intersection
Existing Pathway Structures (25)
Boardwalk
Pathway Bridge
Pathway Integrated with Road Bridge
Stairway
Existing Roads (26)
Highway (State-controlled Road)
Arterial (State-controlled Road)
Arterial
Sub Arterial
Trunk Collector
Industrial Collector
Principal Rural Road (State-controlled Road)
Principal Rural Road
Village/Township Collector
Rural/Rural Residential Collector
Existing Pathways (27)
Principal Pathway
Distributor Pathway
Collector Pathway
Future Parks (29)
Local Recreation Park
Neighbourhood Recreation Park
Neighbourhood Sports Park
Regional Recreation Park
Regional Sports Park
Existing Parks (30)
Local Recreation Park
Neighbourhood Recreation Park
Neighbourhood Sports Park
Regional Recreation Park
Regional Sports Park